Technical Documentation - FAQs

FAQ Search
Most Recently Published FAQs

Results 51 - 60 of 100

FAQ ID Description
FA237359Is it possible to use Altivar 71 drive in 4 quadrants.
The 4 quadrants of working for an ATV71 drive corresponds to the graph where the speed is the X-axis and the torque is the Y-axis.  When the sign...
FA237357What is the general PID setting for ATV303 drive.
Refer to attached document of general PID setting for ATV303 drive.
FA237356What are the recommendations of inspection & maintenance for soft starter Altistart 48.
Refer to attached document of inspection & maintenance for soft starter Altistart 48.
FA237355What are the recommendations to select the Generator for Altivar 71 drive.
The generator must deliver the starting current with the minimum variation of the voltage frequency and drop voltage. So, the power of the generators...
FA237354What is the power consumption of ZBRRC Programmable receiver.
Power consumption of ZBRRC Programmable receiver is 20W.
FA237353What is the derating for high altitude application for Altivar 12 drive.
Up to 1000 m without derating 1000...3000 m derating the current by 1 % per additional 100 m.
FA237352What is the derating for high altitude application for Altivar 312 drive.
For ATV312H*****  Up to 1000 meter without derating. For ATV312H***M2: Up to 2000 for single-phase supplies and corner grounded distribution networks, derating...
FA237114What is the recommended size cable, torque & screw driver for input terminals of PowerLogic PM5500 series meter.
Attached are the recommended size cable, torque & screw driver for input terminals of PowerLogic PM5500 series meter.
FA237113What is the recommended size cable, torque & screw driver for input terminals of PowerLogic PM5100/PM5300 series meter.
Attached are the recommended size cable, torque & screw driver for input terminals of PowerLogic PM5100/PM5300 series meter.
FA236831How and where do you do the selection 4 wires or 2 wires + ULP in different Micrologics of Air Circuit Breaker.
Please see attachement how and where do you do the selection 4 wires or 2 wires + ULP in Micrologic E, P, H, A and Micrologic without metering.

Results 51 - 60 of 100